Interesting in regards to Southern Georgina Basin
Also included in the Amended Farmin Agreement is Statoil's commitment to bear the cost of abandonment and reclamation of surface lands as well as the existing three wells at no cost to PetroFrontier.
These operations are also planned for 2014 to capture operational and cost efficiency. Statoil (the "operator") does not believe material new information will be obtained from testing the Macintyre-2H well, as the presence of H2S is believed to be an indication of water in the wellbore area, as was seen in the Owen-3H well.
The new wells have been selected to avoid vertical faulting, which is believed to be the primary source of water and with it, H2S, at the Owen-3H and Macintyre-2H wells. The Baldwin-2Hst1 well with its casing failure is considered by the operator to warrant permanent abandonment.
PetroFrontier Corp. announces 2014 Work Plan and Budget for the Southern Georgina Basin
- Forums
- ASX - By Stock
- CTP
- surprise production area
surprise production area, page-29
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CTP (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $39.49M |
Open | High | Low | Value | Volume |
5.3¢ | 5.3¢ | 5.3¢ | $1.905K | 35.93K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 39935 | 5.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.7¢ | 34819 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 39923 | 0.053 |
5 | 333254 | 0.052 |
3 | 536685 | 0.051 |
5 | 385000 | 0.050 |
3 | 40418 | 0.041 |
Price($) | Vol. | No. |
---|---|---|
0.057 | 34819 | 1 |
0.058 | 100000 | 1 |
0.060 | 99559 | 2 |
0.062 | 11500 | 1 |
0.069 | 200000 | 1 |
Last trade - 11.19am 06/11/2024 (20 minute delay) ? |
Featured News
CTP (ASX) Chart |