AEV 0.00% 1.2¢ avenira limited

more light reading, page-9

  1. 3,272 Posts.
    lightbulb Created with Sketch. 554
    Probably is mercury

    What I like about it is from what I can tell most of these new production processes normally have two parts start up and production. during construction they will have a project manager to supervise the setup who would normally get more $$$ then once the plant is up and running u get in the production manager for the longer term.

    For me it could be a sign that the demo plant is moving from startup to production which is a good thing.

    If the guy was no good he wouldnt have last two yrs in the role?

    Any how, with the lack of news and a sp slowly drifting down at least it is something to put a bit of faith in.


 
watchlist Created with Sketch. Add AEV (ASX) to my watchlist
(20min delay)
Last
1.2¢
Change
0.000(0.00%)
Mkt cap ! $32.44M
Open High Low Value Volume
1.2¢ 1.2¢ 1.2¢ $16.68K 1.390M

Buyers (Bids)

No. Vol. Price($)
11 3650738 1.1¢
 

Sellers (Offers)

Price($) Vol. No.
1.3¢ 500000 3
View Market Depth
Last trade - 15.44pm 12/09/2024 (20 minute delay) ?
AEV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.