Timing of CR???!!
31 January 2014.
Drilling operations are underway and material results will be communicated once they come to hand. The well
has been drilled through the curve and is at approximately 14,000’ total depth.
- Forums
- ASX - By Stock
- AKK
- trading halt!!!
trading halt!!!, page-21
-
- There are more pages in this discussion • 80 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
STX
Strike hands $48.5M contract to Clarke Energy to produce 20x 4.5MW gas engines for Sth Erregulla
GML
Gateway Mining sells WA Eastern Montague gold project to Brightstar for $14M – half of that in shares