Gold production could begin within 4 months. The Uranium is free carried until a decision to mine is made. Uranium mining could begin within 12-18 months. provided it is insitu leached. As this will be considered an extension to the existing Beverley mine.
The Eastern side of the 4 mile deposit can probably be leached. It contains an estimated 13,000 tonnes and could be much larger. The Eastern side of the 4 mile deposit is still massively open. The entire 4km western edge has not yet been delineated.
Don't just take my word for it, Get out those announcements Check out all the drill results.
This discovery is VERY BIG.
Check out the resource estimate here! www.adam.com.au/paul
AGS Price at posting:
0.0¢ Sentiment: None Disclosure: Not Held