Max Not much reality there.
I find it odd that back in about April, CDU were happy to post some detail on what percentage ore was going into its stockpiles. It gave some idea as to what was being accumulated.
That practice stopped though.
We have been told that there are some 500,000 tonnes in the stockpile, but there is no report on what percentage and tonnage each classification of ore is. They stopped giving that.
Unless CDU do state the makeup of the stockpile, processing through the plant initially won't tell you a thing about what the average % is.
Clearly there is ore there of a high %, but the era;i question is how much?
Once the high grade stuff is processed then there will be lots at a much lower grade.
Hey they have reported some areas where there is more copper than originally thought.Have they reported all areas where there is less copper than thought?
The most interesting numbers will be what tonnes and % each pile holds in the stockpile. At the moment I can only assume that those numbers are not that interesting, else we would have heard about them already.
Add to My Watchlist
What is My Watchlist?