The potential toll treatment plant can only be Leinster which is located north of Leonora and about 220km by road from Mt Windarra.
Why would anyone think it viable for any nickel operation to move 700,000 tonnes per year of nickel ore grading about 1.5% nickel 220km by road? So about 99% or 690,000 plus tonnes per year of the transported ore will be left as waste to be dumped at Leinster or will they load the return trucks with slurry waste and return it to Mt Windarra for disposal?
They sure do need gold credits to make this project work.
- Forums
- ASX - By Stock
- POS
- its out
its out , page-16
-
- There are more pages in this discussion • 19 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add POS (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $16.72M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.4¢ | $9.399K | 2.388M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
108 | 62380125 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 51637167 | 37 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
100 | 59548459 | 0.003 |
32 | 49452556 | 0.002 |
17 | 26778697 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 50759194 | 33 |
0.005 | 37502146 | 20 |
0.006 | 8953000 | 11 |
0.007 | 8440936 | 8 |
0.008 | 1800000 | 1 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
POS (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online