im just wondering if the tug boat has come in to the rig due to crew change outs during the week. Vessels have to be within 500m of the platform during heliops on mine. Be interesting if it leaves the rig on friday would back up this potential theory.
As for well testing, from my experience because this is what i do for a living in the north sea although still relatively new to this, they wouldnt well test the upper jurassic until they had completed drilling the entire well. They would preforate the middle then the upper as its more valuable and already have flow rates from mo-2 for upper jurassic.
Therefore if we assume the report is uptodate and still 600metres to go i would say we are looking at a minimum of 2 weeks prior any well test results.
Unlucky jka sh's or lucky if theres F'all but water in the middle jurassic
I still think we should get an rns from cairn for TD and suspending well for test. But wait and see, tug boat worries me.
Add to My Watchlist
What is My Watchlist?