would have thought that at least the company wouldve proof-read the research report before placing it on its website...
i have previously mentioned the confusing assertions within the failure and success scenario, which when one thinks about it, is quite peculiar (??)...
in the success scenario on junon they have a 14c price by end 2014... now here one is not sure whether they just mean in terms of successful 3d seismic campaign but that is all the work that can possibly be done by the end of 2014, so one must assume that is does refer to the 3d seismic work which will hopefully begin by end of may14...
yet for the failure scenario it states dry well... but no drilling is being planned or due for at least until the second half of 2015... if one goes by the farmout deal...
hmmm....
- Forums
- ASX - By Stock
- ZMM
- am gobsmacked
am gobsmacked
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ZMM (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $1.386M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 259333 | 0.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.2¢ | 4000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 259333 | 0.009 |
7 | 4263000 | 0.008 |
3 | 750124 | 0.007 |
2 | 350000 | 0.006 |
4 | 1600000 | 0.005 |
Price($) | Vol. | No. |
---|---|---|
0.012 | 4000 | 1 |
0.013 | 500000 | 1 |
0.014 | 10000 | 1 |
0.015 | 508103 | 2 |
0.020 | 18358 | 1 |
Last trade - 16.12pm 11/10/2024 (20 minute delay) ? |
Featured News
ZMM (ASX) Chart |
Day chart unavailable