Ann: COE acquires Gippsland Basin gas and liquids, page-2

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 11,048 Posts.
    lightbulb Created with Sketch. 3713
    re: Ann: COE acquires Gippsland Basin gas and... Not sure what to make of this strategy,

    Background reading
    http://subseaiq.com/data/Project.aspx?project_id=490

    "The BMG project commenced production on Dec. 17, 2006 and has an estimated field life of 17 years. At peak production, the project is expected to produce roughly 30 to 35 Mbopd. "

    That of course was before

    Feb. 2010 - Resource Investment Strategy Consultants completed its review of Roc Oil's reserve estimates and estimated Roc's remaining gross 2P reserves for BMG stood at 3.1 MMbbl as of year end 2009, assuming no additional development activity.

    Preliminary results from an integrated full field reservoir simulation model of the Basker and Manta reservoirs indicate remaining gross 2P reserves are likely to be reduced from roughly 18 MMbbl to between 3 and 5 MMbbl. This preliminary review is subject to further sub-surface modeling and development optimization work. Currently, BMG produces approximately 6,000 bopd and should produce at an average rate of 5,000 bopd for 2010, and plans for future development on the BMG phase-1 oil project and the phase-2 gas project are being evaluated.


    That Reserves downgrade hurt ROC badly
    http://www.smh.com.au/business/roc-takes-beating-after-bass-strait-downgrade-20100203-ndk6.html

    This ROC Y/E presentation 2010 worth reviewing as to production & forecast
    http://www.asx.com.au/asxpdf/20100225/pdf/31nxjhdmv019fg.pdf

    Also interesting commentary and charts here
    http://www.asx.com.au/asxpdf/20100513/pdf/31q9y8g08ytxz7.pdf

    Especially the $50M to do new wells.....


    Now BMG is thought to contain a 350Bcf Resource
    http://www.naturalgasasia.com/rocs-victoria-gas-project-on-sale

    That must be what the JV referred to a Phase 2 Gas development (and a way to commercialise remaining 2P oil reserves) and where COE interest lies - at least I hope so.

    What did we pay exactly? $1M for the "asset" + $5M if we produce and we now hold to exposure to abandonment costs?

    A steal if we are able to commercial and a terribly costly deal if we exit not being able to monetize.
 
watchlist Created with Sketch. Add BPT (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.