BTR 5.88% 1.8¢ brightstar resources limited

Ann: Kitumba Prefeasibility Study Optimisation Up, page-14

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 4,250 Posts.
    lightbulb Created with Sketch. 1384
    re: Ann: Kitumba Prefeasibility Study Optimis... I think it is not so simple as it may look like on first sight...

    A little bit of background (more can be found on
    http://www.saimm.co.za/Conferences/Pt2012/101-122_Rupprecht.pdf

    Many factor influence the decision of selecting a shaft or decline/ramp to access an underground mine. Some of these factors include the depth of the deposit, geotechnical aspects, production rate, dimensions, availability of capital, and operating costs.
 
watchlist Created with Sketch. Add BTR (ASX) to my watchlist
(20min delay)
Last
1.8¢
Change
0.001(5.88%)
Mkt cap ! $119.9M
Open High Low Value Volume
1.8¢ 1.8¢ 1.7¢ $91.38K 5.089M

Buyers (Bids)

No. Vol. Price($)
48 13708870 1.7¢
 

Sellers (Offers)

Price($) Vol. No.
1.8¢ 2494770 6
View Market Depth
Last trade - 15.53pm 01/10/2024 (20 minute delay) ?
BTR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.