re: Ann: Kitumba Prefeasibility Study Optimis... Forgot to add this one:
Criteria for choosing a Vertical Shaft
A vertical shaft should be chosen under the following conditions:
• Ore body should be steep dipping
• Ideal for deep ore bodies
• Provides quick access to ore body
• Most economic hoisting method for depths exceeding 500m
• Quicker return on capital investment
We will know in a few weeks.
- Forums
- ASX - By Stock
- BTR
- Ann: Kitumba Prefeasibility Study Optimisation Up
Ann: Kitumba Prefeasibility Study Optimisation Up, page-15
-
- There are more pages in this discussion • 28 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
Add BTR (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $128.3M |
Open | High | Low | Value | Volume |
1.8¢ | 1.8¢ | 1.8¢ | $27.00K | 1.500M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
50 | 16112325 | 1.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.8¢ | 5977790 | 11 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
47 | 15038061 | 0.017 |
35 | 15607035 | 0.016 |
19 | 5568499 | 0.015 |
11 | 5576843 | 0.014 |
7 | 2899548 | 0.013 |
Price($) | Vol. | No. |
---|---|---|
0.018 | 4377790 | 9 |
0.019 | 10121493 | 19 |
0.020 | 11168345 | 22 |
0.021 | 4135208 | 6 |
0.022 | 3347064 | 9 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
BTR (ASX) Chart |