Blah blah blah ... Picture of green stuff ... Blah blah ... Keep waiting for "schlumberger repot and any other outside consultants needed" ....
Sounds like more months of stringing stuff along while throwing out confetti to me - if flow results show up within two weeks I'll fall over backwards
- Forums
- ASX - By Stock
- ETR
- ann: td reached
ann: td reached, page-8
-
-
- There are more pages in this discussion • 33 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ETR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $13.88M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
ETR (ASX) Chart |
Day chart unavailable