HIG 0.00% 10.5¢ highlands pacific limited

slow & steady wins the race..! n/c, page-5

  1. 159 Posts.
    lightbulb Created with Sketch. 7
    the slow part is true.........

    The finalisation of the definitive capital and operating costs
    estimate for the Kainantu Gold Project will be delayed.

    Recent metallurgical test work on a bulk sample collected from the
    strike drive has demonstrated excellent gold recoveries in excess of
    93%. However, this section of the gold mineralisation has reported
    higher levels of soluble copper than encountered in previous
    testwork.

    As a consequence, additional testwork and engineering studies are
    required to finalise the metallurgical flowsheet. The capital and
    operating cost estimates cannot be completed until the process
    flowsheet has been determined.

    The additional work is expected to take up to three months to
    complete.
 
watchlist Created with Sketch. Add HIG (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.