CDU 0.00% 23.5¢ cudeco limited

Ann: Rocklands Process Plant Update, page-20

  1. 2,755 Posts.
    The Rocklands Project TSF is designed for a minimum storage capacity of 30 million tonnes of tailings waste to match the 30mt of ore (less removed product) scheduled to be processed through the Rocklands Process Plant during the current 10 year mine plan.
 
watchlist Created with Sketch. Add CDU (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.