If A5 can achieve the rate of A4 I'd be happy with that... 1.2 km between them and 1.7 km between A2 & A5 means a nice pocket of oil to be tapped. They have estimated 6 wells on Atzam field... A#4 & 5
being appraisal wells the following wells should be drilled shallower and quicker.
still a year or 2 away from turning this into a profitable business IMO, as long as they can keep cash flow keeps comming in and they can raise at reasonable levels and keep working at it until then it's ok with me for now. O&G waiting game.
GLA
- Forums
- ASX - By Stock
- ETR
- All bs aside...
All bs aside..., page-43
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ETR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $13.88M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
ETR (ASX) Chart |
Day chart unavailable
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
Previous Video
Next Video
SPONSORED BY The Market Online