ETR 0.00% 0.7¢ entyr limited

night n day, page-72

  1. 21,349 Posts.
    lightbulb Created with Sketch. 2087
    Hey Monark, you're slipping (again) the pressure must e getting to you. Wasn't you who sold this morning was it? Or, did you buy???

    "According to who (sic)? This from ann on 15 January 2014.

    The Operator plans to continue producing the Atzam #4 well on a highly restricted choke in order to maintain the reservoir integrity during this initial production phase. Following the increase in the choke to 16/64 inches this week, the Operator will monitor the production profile at this new setting before opening the choke further. The intention is still to increase the choke over a period of time to establish the optimal production rate for this producing carbonate section. Independent reservoir engineers Ralph Davis have advised that the well could be produced at an optimal production rate of 466 bopd, whilst maintaining the reservoir’s structure and integrity.

    Remember that they reckon that 1,000bod would be possible from that 6ft section of C17, but, don't want to take any risks.

    How can A3% be a duster??? Really????? .008???
 
watchlist Created with Sketch. Add ETR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.