Retiredyoung,
Interesting in relation to that posting of a rumour in March--- 6th of March in fact.
12/3 ann states ; 13 3/8 casing set & cemented on 11/3 at MD of 590m. Preparing
to drill ahead in 12 1/2 hole.
24/3 ann states ; Drilling of the 12 1/2 inch hole section reached 1626m MD. While
pulling out of hole to service a mud pump the Essar Land Rig experienced mechanical
issues and is currently on equipment downtime.
Whilst the rumour was very premature, the soothsaying was spot on!!
GLTAH
- Forums
- ASX - By Stock
- SYN
- Calm before the storm.
Calm before the storm., page-22
Featured News
Add SYN (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online