Philley
The previous operator did not miss a 5m oil column. The electric logs were pretty conclusive. The vast majority of the Bookara Sst was tight! IE not reservoir, not pay. There was a small zone less than 1m thick that may have been porous but the likely volume of oil that could have been produced from that interval would not have paid for the cost of running production casing & completion. Hence the previous operator recommended P&A - Key could have sole risked the testing of Dunnart-1 but they didn't. History
All that will come out of Dunnart-2 will be more destruction share holder value.
- Forums
- ASX - By Stock
- KEY
- Halved
Halved, page-10
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KEY (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.262M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
KEY (ASX) Chart |
Day chart unavailable