Owenb79,
I don't mind conversing with one who has some knowledge regarding engineering and construction.
Previous announcement when we saw the photo of the ball mill being loaded said "sailing is scheduled for mid October".
As you would appreciate, transport has a schedule to meet, i.e load onto truck to meet ship leaving by a certain date. We have seen the ball mill being loaded. We were told that this would be shipped mid October. If it was shipped mid October, then it would have arrived in Brazil by now.
It is unconceivable that circumstances would have changed to this time table considering the logistics and cost. Well, we're weren't told of any change in the Q3.
- Forums
- ASX - By Stock
- AVB
- Quarterly
Quarterly, page-41
-
- There are more pages in this discussion • 147 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)