Pear,
Spudding basically refers to an Operator commencing their drilling Operations, simply put when the drill-bit hits the seafloor.
The following is the sequence of events :
1) Offshore well spudding is done using a larger diameter drill bit about 36" (currently underway)
2) This is followed by running a conductor pipe to protect the top-hole about 30" dia.
3) After this, the Blow out preventer is installed & pressure tested
4) They then change over to another drillbit 17.5", run 13" casing and cement that section,
5) Swap over to 12.25" bit & run 9" casing, cement it and drill the 8.5" section.
So a well usually has 4 to 5 sections, depending on its proposed TD.
K2 should b a shallow well (unlike K#1 which TD'd at 3049m) & the first casing point should b about 800-900m & the nxt one should b around 1400-1500m.The reservoir top is expected at apprx 1640m.
The final drilled depth, when drilling ceases on a well, is referred to as TD (ie Total Depth).
Once on TD, they run multiple wireline logs, take sidewall cores, do a flowtest & then set plugs to abandon the wellsite in a safe manner.
The last part is known as P&A & depending on the final results the well is classed as a successful discovery or appraisal well or a duster.
Hope this helps with the industry jargon.
- Forums
- ASX - By Stock
- KAR
- Ann: Kangaroo-2 Appraisal Well, Santos Basin Spuds
Ann: Kangaroo-2 Appraisal Well, Santos Basin Spuds, page-69
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KAR (ASX) to my watchlist
|
|||||
Last
$1.81 |
Change
-0.030(1.63%) |
Mkt cap ! $1.428B |
Open | High | Low | Value | Volume |
$1.82 | $1.85 | $1.78 | $5.670M | 3.143M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
22 | 104533 | $1.80 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.81 | 13008 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
16 | 88269 | 1.795 |
26 | 176105 | 1.790 |
16 | 183869 | 1.785 |
22 | 246876 | 1.780 |
10 | 323226 | 1.775 |
Price($) | Vol. | No. |
---|---|---|
1.800 | 94700 | 31 |
1.805 | 153404 | 25 |
1.810 | 147123 | 14 |
1.815 | 114691 | 10 |
1.820 | 343762 | 12 |
Last trade - 15.11pm 30/07/2024 (20 minute delay) ? |
Featured News
KAR (ASX) Chart |
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online