TAP 0.00% 7.8¢ tap oil limited

Cost of production, page-12

  1. 2,669 Posts.
    Tim

    Try this one!!

    Rationale for waterflooding

    The principal reason for waterflooding an oil reservoir is to increase the oil-production rate and, ultimately, the oil recovery. This is accomplished by "voidage replacement"—injection of water to increase the reservoir pressure to its initial level and maintain it near that pressure

    http://petrowiki.org/Waterflooding
 
watchlist Created with Sketch. Add TAP (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.