Ann: Extensive Gold Intersections in Drilling at Viper and Koting, page-53

  1. 3,448 Posts.
    lightbulb Created with Sketch. 809
    1. They take small samples during the AC drilling at every metre
    2. each sample is bagged and tagged.
    3. To save costs initially they send every 4th sample for analysis (4m samples).
    4. Areas of high interest have all the other 1 m samples sent for analysis to better understand the results / geology.
    5. As we've seen when the 1 m samples are analyzed quite often the grades increase, this is because the 4 m samples missed the bigger grades.
    6. Think there is a lot of areas of Viper where we still only have 4 m sampling of the AC.
    7. Expect grades in those areas to improve significantly as we drill out.

    Like I said plenty of cash for another campaign or 2.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.