    In the final report for mirage 2 (24/2/06)...
    hole was plugged pending arrival of a swabbing unit... expected date not specified.
    If the m2 swabbing unit is delayed until after mid06, then 1000 bopd by mid 06 is only possible if m4 yields 276 bopd. (given we know m1=400, m3=324)...

    any thoughts.. updates, etc on m2 ? ... I may have missed something..
 