figures not adding up 1. There is announ out 24/1 that mirage/ventura production is stabilised at 480bopd
2. M3 is supposed to be flowing at 324 bopd
There is 800 bopd
3. M2 Did it ever flow? will it ever flow? Still waiting on a wiper test. Seems strange that M3 flowed but M2 didn't??? being positive, M2 is between M1 and M3. It should flow.
4. ITC now talk of "greater mirage field" which includes Jindivik and Lightning, producing 1000 bopd IN TOTAL
Have flow rates have been seriously downgraded? Not only has Mirage development been downgraded to 800bopd but Jindvik and lightning may only add 200 bopd .
5. To get to 1000 bopd it looks like we have to drill Jindivik and Lightniing
Has this field been substantially downgraded?? That's what it seems to me.
I hold RPM but no talks on that thread