With a low elevation of 996m, block 29 is also very close to the Cacuilo River, so I'm not surprised that they have suspended mining in that area until the weather permits. It's been a mild wet season to-date so that gave them a window of opportunity to briefly mine block 29.
Bear in mind that the water table would rise during the wet season, so the majority of the lower elevated areas could possibly be copping the wet from both directions.
IMO, at this stage, Wetherall's communication shareholders is not up to par. I would like to see a mine plan, a detailed timetable for ramp-up and a minimum monthly mining report until we reach maximum production. This business of quarterly reporting is not on, and I'll be telling that to the right ppl.
- Forums
- ASX - By Stock
- LOM
- Ann: Diamond Mining Results At Lulo
Ann: Diamond Mining Results At Lulo, page-74
-
- There are more pages in this discussion • 101 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LOM (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.0¢ |
Change
-0.003(6.98%) |
Mkt cap ! $11.60M |
Open | High | Low | Value | Volume |
4.2¢ | 4.3¢ | 4.0¢ | $11.19K | 267.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 77958 | 3.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.2¢ | 39645 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 77958 | 0.039 |
1 | 45446 | 0.038 |
1 | 100000 | 0.037 |
1 | 83360 | 0.036 |
2 | 371414 | 0.035 |
Price($) | Vol. | No. |
---|---|---|
0.046 | 145000 | 1 |
0.053 | 150000 | 1 |
0.055 | 8000 | 1 |
0.062 | 120000 | 1 |
0.069 | 116000 | 1 |
Last trade - 15.51pm 08/11/2024 (20 minute delay) ? |
Featured News
LOM (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
Previous Video
Next Video
SPONSORED BY The Market Online