Redport Ltd (ASX code: RPT) is preparing for a drill program targeting
an "Olympic Dam" style of copper-uranium-gold mineralisation at the
Herakleion prospect within the Edward Creek project in South Australia.
The drilling is scheduled to commence in early April, subject to
rig availability, and will take about a month to complete.
Site preparation is under way with plans for sump construction
and track clearing being prepared.
and many good news to come.
- Forums
- ASX - By Stock
- RPT
- redport to drill for a new olymic dam at herakleio
RPT
redport limited
redport to drill for a new olymic dam at herakleio
-
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)