re: 3 months is not long best to sit back and watch the fun - we have a long way to go - it will take 3-4 months if everything goes to plan (which it will ) for drill results - if we get the go ahead - then we will go to a Pre-Feasibility study - and then to a Final Feasibility and then on to a Bankable Feasibility Study (BFS) which should take about 12 months and if we come up with a JORC categry grade - we are in - and during all that we will have the odd placement here and there and a lot of fun with the share price rising and falling - so sit back and enjoy the ride.
Cheers
- Forums
- ASX - By Stock
- EXT
- must be taking a breather to gain strength
must be taking a breather to gain strength, page-10
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EXT (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.1¢ |
Change
-0.001(8.33%) |
Mkt cap ! $16.22M |
Open | High | Low | Value | Volume |
1.2¢ | 1.2¢ | 1.1¢ | $1.543K | 129.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 3283876 | 1.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.3¢ | 8352781 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 3283876 | 0.011 |
8 | 10304396 | 0.010 |
1 | 140000 | 0.009 |
2 | 900000 | 0.008 |
4 | 833706 | 0.007 |
Price($) | Vol. | No. |
---|---|---|
0.013 | 8352781 | 7 |
0.014 | 7003497 | 5 |
0.015 | 1594178 | 5 |
0.016 | 500712 | 2 |
0.017 | 60000 | 1 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
EXT (ASX) Chart |