Share
18,306 Posts.
lightbulb Created with Sketch. 1538
clock Created with Sketch.
01/06/15
18:06
Share
Originally posted by Jukes
↑
Jonathan Fievez on the Science Show stuck to the normal CWE script rather well but did emphasise that the CETO 6 was their world roll out model. It means that they have now got to get all mechanisms and procedures right with some polish. Hence their laborious efforts in deployment and retrieval of C5s. No doubt the next array off Garden Island will be model C6A with slightly modified ‘final’ model C6B dropped in at WaveHub with great fanfare. Please bring cheque books then.
Take note of the four-part series on waves and energy generation on the Science Show beginning Sat 13 June.
Juke
Expand
Would the fanfare for the 6B because it will have a different type of power off take?