"They don't need a down hole trial. There is an ISO standard that they have already met." yes the ISO standards have been met, this from 17/12/14 ann. "The tests, which were conducted by US based Global Energy Laboratories, confirmed an exceptionally high pressure threshold for the Ecopropp proppants." so the lab testing was all good but it clearly states from 16/07/14 ann. "The funds will be used to advance the business objectives of Ecopropp Pty Ltd, including the construction of a pilot plant for testing and demonstration of its game changing high quality, low cost proppants" So to met the requirements of Milestone 2 they need to do a down hole test - "Milestone 2 Ecopropp completes a successful down-hole trial utilizing its proppants in accordance with specified parameters".
I am relatively new to this so please point me to the correct references if you feel I have made a mistake.
Add to My Watchlist
What is My Watchlist?