BRV 0.00% 35.8¢ big river gold ltd

Ann: Drilling Results from Juruena Gold Project, page-20

  1. 1,569 Posts.
    lightbulb Created with Sketch. 6
    Gidday GZ, In my opinion it's got to do with a lack of experience. Management are trying to do too many things at once badly, rather than concentrating on doing a few things well. They haven't fully thought though their original goal right to the end. They became excited by this or that, failed to tidy up any lose ends whilst starting to embark on new adventures. They have MASSIVELY under estimated how long things take in Brazil and are now jogging along with the hope (I hate that word) that things will fall into place. No real direction, no realistic timeline to match their ambitions. Gezz, I wish Mike Young from vmy/czi could spend a week their. So in the time being they have nothing that can be reported to share holders because some plans have been left to vanish in the ether, whilst other plans are so misjointed that to release them via the asx in their current form would be illegal because it would resemble a mumbled up lot of half baked ideas, hopeful plans and only some concrete statements. Sorry management, only my opinion, what I say may not be fact. I really hope you prove what I say to be wrong. Let me have egg on my face and show me up as a fool who has no idea of the real circumstances. The share price is now 14.5 cents by the way management.
 
watchlist Created with Sketch. Add BRV (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.