Share
26,540 Posts.
lightbulb Created with Sketch. 1
clock Created with Sketch.
11/08/15
18:13
Share
Originally posted by cal50
↑
if and when wireless over takes the need for hardwiring who cares , as technology improves who knows maybe you will need higher speeds to get the same download ????
the LNP is fixing a huge mess that labor greens left them and have already done wonders with getting the service up and running quicker than labor greens could ever dream about , the labor green morons are good at dreaming things up and thats it , just like the many super clinics that labor greens where going to build and only 1 ever got finished
Expand
The LNP broke the NBN on purpose.
Since the Telstra deal was completed in 2012, construction was being ramped up, that was up until the LNP halted\slowed the construction phase in 2013.
As for the GP Super Clinics, there are well over 40 open.
GP Super Clinic locations
http://www.health.gov.au/internet/main/publishing.nsf/Content/pacd-gpsuperclinics-locations