FAR 0.00% 51.0¢ far limited

SNE-2: rig arrival, page-3

  1. Ya
    6,809 Posts.
    lightbulb Created with Sketch. 3829
    Takes less then a week for the top hole section. They need to drill SNE-2 towards 2400m and then see what the lies beneath the crestal location at SNE-2. Wk-3 in Nov is my estimate.

    These r shallow wells so wont take long & that includes coring runs.

    Testing is the slower part, as it involves conditioning the hole, running casing, followed by making up Test tools/perf guns etc & perforate the relevant test intervals & letting the well clean up its fluids. Fingers crossed for a smooth run.
 
watchlist Created with Sketch. Add FAR (ASX) to my watchlist
(20min delay)
Last
51.0¢
Change
0.000(0.00%)
Mkt cap ! $47.12M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
2 75195 50.5¢
 

Sellers (Offers)

Price($) Vol. No.
51.0¢ 192769 4
View Market Depth
Last trade - 12.33pm 02/09/2024 (20 minute delay) ?
FAR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.