Excellent results .. good flow from both the top two sections. Top shut in for pressure test by weeks end. Another 4,200 bopd from the middle resrvoir section and 2,115 pre-shutin flow fropm the top section (so it could increase).
Unequivocal good news and Simon says this reduces the reservoir size required for commerciality as fewrer wells may be required. Total of over 10,000 bopd from the three levels and possibly more.
H
- Forums
- ASX - By Stock
- HDR
- oil flows from the top 2 sections at waraga
HDR
hardman resources limited
oil flows from the top 2 sections at waraga
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)