They report in Feet over there. So Ice#1 had another 1677 ft to 7" casing point & drill towards the marker before tripping out & running in with two separate 90ft coring assemblies.
GB did the same up north, at Alcor & Merak, so not surprised to see the same operative procedures at Ice#1. The former 2 were subsequently kicked off as laterals in the Shale, not sure abt the flowrates as that's not on Open file. Merak is apprx 28kms due north from Ice#1 & was cored from 9012-9089' & then from 10611-10933'. TD was 11094' measured depth.
So after cuting cores 88E will drill out the rest of the play ie Kuparuk, Kingak & Shubilik formations till prognosed TD of 11600'.
Good to see them have a spectral gamma assembly organised for the core when it comes out. Should b the usual process, ie cut it into 1 metre lengths, chip off the edges for quick looksy, seal the rest of it & send it off to the labs for routine core analysis & other complex studies.
So post TD & logging they'll update the mkt on the total gross pay intersected in the Cretaceous play & relevant net pay. They arent doing a DST here. The core samples as such will take months in the lab. That should help them with deciding on Ice#2 etc. Hope this helps.
- Forums
- ASX - By Stock
- 88E
- Few hundred metres to go
Few hundred metres to go, page-3
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add 88E (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.3¢ |
Change
0.001(50.0%) |
Mkt cap ! $86.67M |
Open | High | Low | Value | Volume |
0.2¢ | 0.3¢ | 0.2¢ | $15.57K | 7.228M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
101 | 156421343 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 573323665 | 175 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
100 | 146421343 | 0.002 |
307 | 1113321452 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 553323665 | 174 |
0.004 | 216036285 | 108 |
0.005 | 74353413 | 56 |
0.006 | 125873189 | 42 |
0.007 | 25381369 | 28 |
Last trade - 16.10pm 10/07/2024 (20 minute delay) ? |
Featured News
88E (ASX) Chart |
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO
Charles Armstrong
CEO
SPONSORED BY The Market Online