Targets are :
Upper Cattamarra Coal Measures - D Sands only
Lower Cattamarra Coal Measures - LC-1 Sands
(These are shown as Drill Stem Tests in Gin Gin-1)
Reference 2015 Sept.Presentation p11)
They have mentioned that there are possibly a few more targets that were missed in the original GG-1 test)
Stopped drilling. Well yes, the last pause was to install the 240mm casing.
B Sands . Looks like Red Gully-1 accumulated the whole lot. Maybe something in another drill down the track.
- Forums
- ASX - By Stock
- EGO
- Ann: Trading Halt
Ann: Trading Halt, page-23
-
- There are more pages in this discussion • 34 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)