EGR 2.04% 9.6¢ ecograf limited

Ann: Access to Japan-Korea Battery Market with Sojitz Corporation, page-66

  1. 932 Posts.
    lightbulb Created with Sketch. 1
    So are you saying it will only rain on the bridge but not on the road on either side of the bridge?
    There will be more major delays, there always is, it is Africa.
    If it isn't locals stealing construcion materials, it's something else.
    It will be be no surprise at all, if this project, start to finish goes well beyond 5 years.
 
watchlist Created with Sketch. Add EGR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.