re:lots of seller why bother Wilf
In their latest broker presentation,(8/5/06)... CBH actually use a 2007 production figure of 160,000 tonnes zinc in concentrate. Their previous record quarterly production was 34,500 tonnes - or under 140,000 tonnes PA.
Therefore total ore produced would need to be about 1.4 mtpa - containing 160,000 t - recoverable about 85,000 t of which they would produce about 83% zinc metal (or payable zinc)-which is 70,000 tons.
All my calculations previously (of about 58,000 t zinc metal)were based on historic production levels. That link from their web, together with their forecast in the recent broker presentation and Hartleys comment- certainly gives a strong indication of a likely 1.4 mtpa ramp up. (and bigger profits than numerious calculation I have previously made)
- Forums
- ASX - By Stock
- CBH
- lots of sellers why bother
lots of sellers why bother, page-4
-
- There are more pages in this discussion • 19 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CBH (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.5¢ |
Change
-0.002(2.60%) |
Mkt cap ! $9.03M |
Open | High | Low | Value | Volume |
7.7¢ | 7.7¢ | 7.5¢ | $9.494K | 125K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 135705 | 7.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.4¢ | 100000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 135705 | 0.075 |
1 | 100000 | 0.055 |
1 | 9800 | 0.053 |
2 | 203170 | 0.041 |
3 | 255710 | 0.035 |
Price($) | Vol. | No. |
---|---|---|
0.084 | 100000 | 1 |
0.089 | 11110 | 1 |
0.090 | 100000 | 1 |
0.094 | 85000 | 1 |
0.096 | 10553 | 1 |
Last trade - 15.37pm 28/06/2024 (20 minute delay) ? |
Featured News
CBH (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online