You are correct Hank.
They have yet to have a completed fabricated chip with all end-to-end components installed. From memory, the final version of the ASIC (Application Specific Integrated Circuit) component was being held up by the fabrication manufacturer's scheduling, but was due in the next month or two.
- Forums
- ASX - By Stock
- AKP
- Next trigger
Next trigger, page-3
Featured News
Add AKP (ASX) to my watchlist
(20min delay)
|
|||||
Last
$6.20 |
Change
0.000(0.00%) |
Mkt cap ! $181.1M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AKP (ASX) Chart |
Day chart unavailable