Yesterday's report gave JORC reserve for Njame North at 2,200 tonnes/ 4,840,000 pounds of U open in three directions which is very interesting stuff BUT nothin' was said about Njame South which is a larger project of lower grade, near surface open pittable U.
IMHO we might be looking at around +10,000,000 pounds of U from both North & South. This is getting into OMC's reserve level at around a 75% discount for a similar reserve both at the Kariba location.
The valuation is very seriously undervalued and out of line here.
- Forums
- ASX - By Stock
- EVE
- results from njame south
results from njame south
-
-
- There are more pages in this discussion • 25 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EVE (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.274M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
EVE (ASX) Chart |
Day chart unavailable