Guys,,,thinking back to my site visit and as a bit of extra info of my time spent with john baguley,i remember him saying that 1 item of equip ordered and being built in china,weighs 5000 tonnes,now i spent 4 months on a general cargo ship and can tell you that a lift of that magnatude is huge,so to just lift and place on the hard stand site will take numerous cranes(mobile)after which will be loaded on to multi wheel transporter (extra wheels and axles as nessesary)for the approx 1 mile slightly uphill journey to our site,,,also john told me the foundation will be on top of piles driven down to 75 ft,,,my impression is our project is in veeeerrry capable hands and highly recommend that a visit to the meetings in aus would be most rewarding for the doubters
LNG Price at posting:
67.0¢ Sentiment: Buy Disclosure: Held