LOM 0.00% 6.7¢ lucapa diamond company limited

Africa Downunder, page-74

  1. 2,323 Posts.
    lightbulb Created with Sketch. 91
    Baggy.
    Yep,  short  on  drilling  updates  for  sure,  but  this  appears  to  be  their  chosen
    method. Might  work  for  them  but  its  not  helping  us  part  owners  much.

    Heres  the  latest  on  drilling  I  could  find.

    Kimberlite Exploration P4  last  report,  3/8/16

    At the end of June 2016, Lucapa and its partners commenced a drilling program focusing
    on L259 and other priority kimberlite targets around alluvial Mining Blocks 6 and 8,
    (See ASX announcement  27 June 2016).
    Commissioning issues were encountered with the core drilling component of the mobile
    Sedidrill rig in July
    which required additional equipment to be flown into Angola.
    In the interim, the mobile  rig continued drilling using its auger capability to assist the
    mining team at Mining Block 8 and the exploration team at the E41 alluvial terraces
    (refer Alluvial Development). These commissioning issues were resolved in mid-July and
    core drilling continues. (DD....That's  6  weeks  ago  drilling problem  resolved )
    The first core hole drilled at L259 intersected re-sedimented volcaniclastic kimberlite
    (“SRVK”) material, or crater lake sediments, near surface. This round of drilling is designed
    to target the pyroclastic kimberlite (“PK”) material.

    As was announced in June 2016, to assist in accelerating the kimberlite drilling program,
    an additional, larger, track-mounted diamond drill rig has been scoped, identified and
    will be ordered shortly. ( DD....reported  3/8/16.....possibly  ordered  now)
 
watchlist Created with Sketch. Add LOM (ASX) to my watchlist
(20min delay)
Last
6.7¢
Change
0.000(0.00%)
Mkt cap ! $19.43M
Open High Low Value Volume
6.7¢ 6.7¢ 6.7¢ $8.746K 130.5K

Buyers (Bids)

No. Vol. Price($)
1 15800 6.3¢
 

Sellers (Offers)

Price($) Vol. No.
6.7¢ 47629 1
View Market Depth
Last trade - 16.10pm 10/07/2024 (20 minute delay) ?
LOM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.