    25th October 2006




    • Metallurgical test work program successfully completed as part of Definitive
    Feasibility Study on the Molyhil Tungsten-Molybdenum Project.

    • Production estimates and concentrate specifications exceed initial Scoping Study,
    confirming potential production of approximately 100,000 mtu of tungsten oxide per
    annum and 1,000,000 lbs of Mo per annum.

    • Project water supply confirmed.
    Thor Mining (AIM & ASX: THR) today announced completion of the key metallurgical test work
    phase of the Definitive Feasibility Study for its 100%-owned Molyhil Tungsten-
    Molybdenum Project in the Northern Territory of Australia. The delivery of final concentrate
    specifications from this test work program will enable it to progress negotiations for an off-
    take agreement and financing package for the Project.
    Thor is well advanced with the Definitive Feasibility Study, which is scheduled to be completed
    by mid-November 2006. The Company intends to accelerate development of the Molyhil
    Project with a view to commencing production during 2007.
    The key metallurgical test work program carried out over the past 6 months has been
    supervised by Thor and Proteus Engineering, with the involvement of metallurgical
    consultants, Independent Metallurgical Laboratories Pty Ltd, Orway Mineral Consultants and
    Nagrom & Co.
    The metallurgical recoveries used in the Scoping Study for WO3 and MoS2 were based on pilot
    plant test work conducted by Nagrom in early 2005. The definitive metallurgical results
    received this week have improved the Scoping Study figures, as reflected in the table below:
    Scoping Study
    (Jan2006)
    Definitive Feasibility Study
    (Oct2006)
    Concentrates
    Recovery Concentrate
    Grade Recovery
    Concentrate
    Grade
    Concentrate
    Production @
    300,000 tpa
    Tungsten
    (WO2) 51% 68.6% 67.2% 69.3% 1,511 tonnes
    Molybdenum
    (MoS2) 78.1% 82.5% 77% 85% 905 tonnes

    HIGHLIGHTS
    Molyhil Upgraded Following Completion
    of Metallurgical Testwork



    This equates to planned production of approximately 100,000 mtu of tungsten oxide per
    annum and 1,000,000 lbs of Mo per annum. Current prices for Tungsten Oxide
    concentrates (min 65% WO3) are USD$220mtu and the price for Molybdenum concentrates
    (min 57% Mo) is USD$26lb.
    The most significant change arising from the metallurgical test work program is in the
    recovery of Tungsten to the gravity circuit. The initial flowsheet used magnetic separation
    prior to flotation and gravity recovery, however this procedure is now completed at the end of
    the processing circuit on the finer Tungsten fractions, removing deleterious elements and
    improving overall recovery. The concentrate grade specifications are within a marketable
    range, and improvements in the molybdenum specifications were made with the removal of
    between 2 and 4% copper in concentrates, with copper levels now within specification.
    Recent results from investigative hydrogeological drilling has identified an adequate supply of
    excellent quality water for the project, with six out of the eight locations successful in
    identifying substantial aquifers.
    The Molyhil Definitive Feasibility Study is progressing well with the processing plant,
    infrastructure and mine development capital estimates due within a few weeks
    Thor’s Chief Executive Officer, Mr John A. Young, said: “The completion of the metallurgical
    test work program is an important step in the progress of our off-take agreement, with a
    number of interested parties waiting for these final concentrate specifications. Marketing and
    negotiations can now begin with the aim of securing both a buyer and a finance package that
    will enable development of the Molyhil Project to be fast-tracked.”

    Great signs.

    Regards,
    Snake13.

 
watchlist Created with Sketch. Add THR (ASX) to my watchlist
(20min delay)
Last
1.7¢
Change
0.001(6.25%)
Mkt cap ! $3.914M
Open High Low Value Volume
1.7¢ 1.7¢ 1.7¢ $25.5K 1.5M

Buyers (Bids)

No. Vol. Price($)
3 714842 1.5¢
 

Sellers (Offers)

Price($) Vol. No.
1.7¢ 728173 2
View Market Depth
Last trade - 10.09am 13/09/2024 (20 minute delay) ?
THR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.