PLS 3.17% $3.05 pilbara minerals limited

Food for Thought...., page-69

  1. 4,795 Posts.
    lightbulb Created with Sketch. 4709
    Hi @jumpinjoey , yes of course you are correct, but i only ran it at 30km round trips. round tripping to headland running over 16 hours / 365 would require at least 20 number 100 tonne units, bit of percentage for a contractor, as i suppose they have to earn a profit of course and the cost per tonne would be up around that $16.50+ per tonne mark. would need to increase my other figure from $5 to $6.5 minimum to Wodgina as i left out contractors on cost.

    Cheers

    OW
 
watchlist Created with Sketch. Add PLS (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.