You should be more cautious as it is not as simply as taking commodity selling cost from cost of production for each commodity and extrapolating. Cost of production has a very different definition to operating costs stated in the DFS of $167/t of ore mined (3Mt at phase 1 and 6Mt at phase 2).
Here is a summary page of my DFS model deconstructed using DFS figures (with some simplistic assumptions on depreciation). Net C/F after mining costs and depreciation at DFS commodity pricing is only $463m p.a. for phase 1. Very healthy.
In substituting your commodity pricing as at today, TNG is still cash flow positive but the issue arises with stage 1 CAPEX payback (during years 1-4) and financing stage 2 CAPEX (year 5) which I raised on here a number of months ago. It can't achieve those two capital requirements.
Net C/F is more like $120m (before any CAPEX financing repayment). No very healthy.
- Forums
- ASX - By Stock
- TVN
- TNG is a finance job
TNG is a finance job, page-11
-
- There are more pages in this discussion • 16 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TVN (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.5¢ |
Change
0.004(7.84%) |
Mkt cap ! $97.27M |
Open | High | Low | Value | Volume |
5.4¢ | 5.5¢ | 5.2¢ | $97.96K | 1.823M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 103015 | 5.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.5¢ | 53057 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 103015 | 0.054 |
1 | 11237 | 0.052 |
1 | 100000 | 0.051 |
4 | 161920 | 0.050 |
2 | 40434 | 0.049 |
Price($) | Vol. | No. |
---|---|---|
0.055 | 53057 | 1 |
0.057 | 220000 | 4 |
0.058 | 100000 | 1 |
0.059 | 423800 | 1 |
0.060 | 15000 | 1 |
Last trade - 16.10pm 08/11/2024 (20 minute delay) ? |
Featured News
TVN (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online