    re: when are results due The drilling program was expected to take two weeks (depending on the weather) and was scheduled to begin on the 18/11. It will include 8 rotary drill holes with depths from 70 - 200m - gamma. Historical hole data has already been gathered hence the reason for futher drilling to define a JORC resource. Two twin core holes will be analysed for gamma, u leachibility and U308. There is 20 million pounds already proven but the US system does not comply wioth JORC code.

    The Sweetwater high tech U mill is about to come out of mothballs - only a few kms away.

    We should get some prelim results late this month or in Jan.
 