re: oil This is what we can anticipate on Donga#4 in the nxt 12 hrs, 18 bbls (+/-4bbls) of oil & then move to D#5 by the weekend.
Tests on D#3 produced 23 bbls of light oil. Recovery from the string was 6 bbls of heavy hydrocarbon gas, 3 bbl mud contaminated oil & 39 bbls of formation water. Test interval was rom 1574 - 1582.5m & well was 25m updip from D#1.
cheers