ADV 0.00% 13.5¢ ardiden ltd

ADV - General, page-36

  1. 3,012 Posts.
    The assays are a very reliable guide ..considering the resource is very shallow and open ended.
    the drilling really is only required for finding the bottom and how extensive this may be ..with the drilling confirmation the people knocking at our door for off takes will then want the door opened, the plan is to have a jorced up resource 1st phase by 2nd Quarter 2017 ....so i would expect drilling to commence last week Oct to 1st week November then results can be given at the completion of Drilling or at different stages during the drilling I am hoping we will get plenty of updated drilling from each hole. bear in mind we are drilling 2 areas with a total of 3000 mtrs this should not take to long as our dept should not be a concern , the hard surface should make it a bit easier also further Channel/trench assays from Rootbay /Rootlake will still be ongoing.I am also aware we may access to 2 other Areas as well , who knows this could become a very large Resource. if so we are in a very favorable spot Railway/Local support/Gov support etc. So I would expect we will have constant updates over the next couple of months...cheers
 
watchlist Created with Sketch. Add ADV (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.