CNJ 0.00% 0.1¢ conico ltd

cobalt breaks 23,800, page-139

  1. 880 Posts.
    lightbulb Created with Sketch. 98
    I've just come back to CNJ and was wondering if I could clarify if these are the figures we're still working with?

    Capex $70m / Operating cost $5.55 per lb
    40,000 tonnes of cobalt resources / 36,000 tonnes @ 90% recovery
    $1.44B revenue @ $40,000 AUD per tonne

    Thanks, feel free to correct or add anything.
 
watchlist Created with Sketch. Add CNJ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.