re: chart well oiled beef hook Will they will wait until confirmation rather than reporting on any further estimates from the drilling crew contractors?
Drilling Status Report – 5 December 2006
• Paradox Basin #1 well is at 15,397 feet (4,692 m) at the base of the Pinkerton Trail Formation
• Casing has been successfully set and cemented from 9,743’ to 15,397’
• Rig is recovering pipe attached to the casing hanger prior to drilling into the Leadville Limestone objective
The rig is currently recovering 1,000’ of drill pipe left attached to the casing hanger. This is proceeding normally at a rate of approximately 400’ per day.
- Forums
- ASX - By Stock
- GDN
- chart
chart, page-19
-
- There are more pages in this discussion • 18 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
TLX
Telix jumps 11.6% as US government indicates proposed medicare changes won't affect prostate cancer drug
RNU
Renascor wins a funding boost given it wants to produce a critical mineral – but $5M award pales in comparison to some