    Keep in mind that given the EPA approval - NAG does not incur a $50-60 per tonne levy that is normally charged by the EPA for PASS

    Furthermore though - if one looks at the directives of the Metro Tunnel project....

    http://metrotunnel.vic.gov.au/__dat...aminated-Land-and-Spoil-Management-Part-1.pdf

    The Spoil Management Plan (SMP) would be developed by the Contractor and would identify methods to manage the excavation, on-site handling, transport, off-site treatment and disposal/re-use of spoil. A specific acid sulfate soil and rock management sub-plan would be prepared and approved by EPA to manage acid generating materials. Clean fill would likely be directed to off-site re-use, subject to finding a suitable site(s). Any acid sulfate soil and rock would be transported off-site to suitable facilities with an EPA-approved Environmental Management Plan (EMP) in place.
 
watchlist Created with Sketch. Add NAG (ASX) to my watchlist
(20min delay)
Last
0.9¢
Change
-0.001(10.0%)
Mkt cap ! $7.169M
Open High Low Value Volume
0.9¢ 0.9¢ 0.9¢ $8.897K 988.5K

Buyers (Bids)

No. Vol. Price($)
6 3280631 0.8¢
 

Sellers (Offers)

Price($) Vol. No.
1.0¢ 332571 4
View Market Depth
Last trade - 14.50pm 15/08/2024 (20 minute delay) ?
NAG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.